Uncredited photos on this page taken by: Nathan Holth. Unless stated in a caption, all photos are Copyright with All Rights Reserved. Learn about reuse of our photos.
![]()
![]()
Informational construction sign.
![]()
Canadian temporary tower erected.
![]()
Beams for bridge.
![]()
Canadian temporary tower erected, approach spans still under construction.
![]()
American temporary tower being erected.
![]()
A crane lifts sections of the American temporary tower.
![]()
Portions of American temporary tower on the ground ready for erection.
![]()
A crane lifts a beam for the new bridge.
![]()
A crane lifts safety netting for placement under the bridge.
![]()
Erection progress.
![]()
A train heads toward the bridge.
![]()
Erection of the main span arch begins. It can be seen that hangers were erected before the arch rib in some of these photos.
![]()
A crane picks a large beam.
![]()
Old and new piers.
![]()
Overview of American construction site. Numerous beams ready for erection are visible.
![]()
Overview from the Canadian side.
![]()
One of the construction cranes.
![]()
Looking up at the temporary tower.
![]()
A crane picks a large beam.
![]()
American approach span construction.
![]()
View under historic bridge looking toward new pier.
![]()
Distant views showing continuing arch span construction.
![]()
Views under bridge showing continuing arch construction.
![]()
Views beside bridge showing continuing arch construction.
![]()
A crane picks a large beam.
![]()
Arch rib segments can be seen being moved into place in these photos.
![]()
Arch construction continues, getting close to linking the two halves of the bridge together.
![]()
Boats on the construction site.
![]()
In this photo, only one panel of construction remains to connect the two halves of the bridge.
![]()
The final segments of the tie are moved into place.
![]()
The northern arch tie was the first to be connected as seen in this photo. One of the first boats to pass under the newly connected structure is visible.
![]()
Both ties are now connected, but the arch ribs are not yet connected.
![]()
Cranes lift a large beam, which may be one of the final arch rib segments.
![]()
The northern arch rib was the first to be connected as seen in this photo.
![]()
This photo shows cranes lifting the final arch rib segment into place.
![]()
The arch rib and tie are now both completed.
![]()
Continuing work on the American approach spans.
![]()
With the arches connected, the temporary towers can be dismantled. Here, many of the the Canadian tower cable stays have been removed.
![]()
The American tower with most of its cables removed.
![]()
The American tower is being dismantled.
![]()
The Canadian tower remains standing with the American tower completely gone.
![]()
Cranes are packed up and shipped out.
![]()
The nearby railroad line found additional use during this project. Here, construction equipment is being loaded up to be hauled away.
![]()
Finally, the Canadian temporary tower is dismantled.
![]()
![]()
![]()