Uncredited photos on this page taken by: Nathan Holth. Unless stated in a caption, all photos are Copyright with All Rights Reserved. Learn about reuse of our photos.
![]()
These photos show the bridge at M-86 being disassembled for transportation.
![]()
These photos show the bridge at M-86, with workers picking the truss segments and placing them on the ground.
![]()
A truss segment at the M-86 location ready for transportation.
![]()
These photos show the truss segments in Ecorse, Michigan where they were painted by Ojibway, Inc and repaired by Bach Steel.
![]()
Hot rivets being driven during the restoration work.
![]()
Restored trusses on-site at Crystal Springs Street awaiting placement over the river.
![]()
Restored floorbeams on-site at Crystal Springs Street awaiting placement over the river.
![]()
Because the trusses were shipped in segments, field riveted was required to reassemble them. These photos show the newly driven rivets.
![]()
Abutment construction.
![]()
Photo Credit: Nels Raynor, Bach Steel.
Picking the truss segments and placing them over the river.
![]()
Photo Credit: Nels Raynor, Bach Steel.
View of one of the trusses completely over the river.
![]()
Truss bridge fully assembled, with abutment, deck, and approach still under construction. Portal views facing west.
![]()
Truss bridge fully assembled, with abutment, deck, and approach still under construction. Views beside bridge from southeast quadrant.
![]()
Truss bridge fully assembled, with abutment, deck, and approach still under construction. Oblique views from southeast quadrant.
![]()
Truss bridge fully assembled, with abutment, deck, and approach still under construction. Views of truss web.
![]()
Truss bridge fully assembled, with abutment, deck, and approach still under construction. Plaque.
![]()
![]()