Uncredited photos on this page taken by: Nathan Holth. Unless stated in a caption, all photos are Copyright with All Rights Reserved. Learn about reuse of our photos.
Directions assume a north-south alignment.
Elevation of main span from southeast quadrant.
East elevation of southern approach spans.
View beside bridge from southeast quadrant.
East elevation showing the double girder span.
Portal view in front of double plate girder span, facing north.
Portal view in front of double plate girder span, facing south.
Portal view on double plate girder span, facing north.
Portal view in front of main truss span, facing north.
Portal view in front of main truss span, facing south.
Portal views on truss span facing north.
Portal view on truss span facing south.
Zoomed portal views on truss span facing north.
Views of truss web.
West elevation of south approach.
Views between sothern approach structures, facing north, Intercity Viaduct to the left.
Views between approach structures, facing south, Intercity Viaduct to the right.
Views under south approach looking south.
Zoomed views under south approach looking south.
Views under south approach looking north. Various positions and HDR exposures included above.
Zoomed views under south approach looking north.
Trail signage.
Interpretive sign about modern decorations on bridge.
Approach span girder details.
Approach span bent and associated bracing details.
View under approach spans showing floorbeams and lateral bracing.
Details of lower deck girder of the double-girder span.
Empty rivet holes at ends of floorbeams are evidence that there once was a cantilevered deck that was removed here.
Deck cantilever bracket.
This is a rather impressive display of pack rust and subsequent section loss on a lower chord batten plate.
Floor beam detail at girder.
Bracing connections.
Bearings.
Expansion bearing.
Top chord connections as viewed from on bridge.
Intermediate connections as viewed from on bridge.
Bottom chord connections as viewed from on bridge.
Top chord.
Bottom chord.
Original lattice railing.
Modern railing.
Floor beams.
Lower deck flooring system which extends beyond the pedestrian walkway which is likely narrower than the original deck.
Posts and other details at end of truss spans.
Truss members.
Lower lateral bracing.
Truss bracing details.
Portal view at northern approach spans facing north.
Portal view under northern approach spans facing north.
View under northern approach spans showing ramp that has been added to the bridge to the left.