This special photo gallery documents this bridge from 2008-2021, including a detailed documentation of the bridge's 2021 rehabilitation. Photos are presented roughly in several overarching groups, ordered chronologically.
![]()
2008-2011 Photos Taken By: Elaine Deutsch
Elevation.
![]()
Oblique views.
![]()
Views beside bridge.
![]()
Portal views.
![]()
Plaque.
![]()
Views of truss web.
![]()
Truss panels.
![]()
Top chord connections as viewed from on bridge.
![]()
Bottom chord connections as viewed from beside bridge.
![]()
Views under bridge.
![]()
Abutments.
![]()
Railing.
![]()
Outrigger details.
![]()
2019 Photos Taken By: Nathan Holth
![]()
Portal views.
![]()
Portal views on bridge.
![]()
Oblique views.
![]()
Elevation.
![]()
Views beside bridge.
![]()
Views of truss web.
![]()
Bridge plaque.
![]()
Eastern brand.
![]()
Top chord connections as viewed from on bridge.
![]()
Bottom chord connections as viewed from on bridge.
![]()
Outrigger.
![]()
Posted weight limit.
![]()
Segment marker.
![]()
2021 Photos Showing Bridge Rehabilitation. All Captions Provided and Photos Taken By: Renee A LaBarge
![]()
The last autumn as a yellow bridge: October 21, 2020
![]()
Christmas Tree on closed bridge: December 16, 2020
![]()
January 10, 2021
![]()
Equipment starts arriving: January 25, 2021
![]()
Railings are removed: January 27, 2021
![]()
Plaque is removed: January 27, 2021
![]()
Railings awaiting their next homes: January 31, 2021
![]()
Concrete decking is removed: February 9, 2021
![]()
February 13, 2021
![]()
The Day of the Swinging Bridge: February 17, 2021
![]()
Abutment work: February 17, 2021
![]()
Bridge rehab work: February 17, 2021
![]()
Covered bridge phase begins: February 25, 2021
![]()
March 6, 2021
![]()
March 7, 2021
![]()
March 9, 2021
![]()
March 17, 2021
![]()
Rusted sections being removed: March 16, 2021
![]()
March 21, 2021
![]()
March 25, 2021
![]()
March 30, 2021
![]()
April 1, 2021
![]()
Picking up the pieces: April 13, 2021
![]()
April 18, 2021
![]()
Floor beams in place - Primer gray: April 19, 2021
![]()
Painted brown: May 4, 2021
![]()
May 5, 2021
![]()
May 12, 2021
![]()
May 18, 2021
![]()
Bridge Moving Day: May 19, 2021
![]()
June 7, 2021
![]()
June 29, 2021
![]()
June 30, 2021
![]()
July 19, 2021
![]()
Bridge contractors just before bridge reopens: July 30, 2021
![]()
September-October 2021 Photos Showing Rehabilitated Bridge. All Photos Taken By: Renee A LaBarge
![]()
Day before big flood from Tropical Storm Ida: September 1, 2021
![]()
September 18, 2021: Bridge survived the flood!
![]()
Oblique views.
![]()
Elevation.
![]()
Views beside bridge.
![]()
Portal view.
![]()
View of truss web.
![]()
End post.
![]()
Views under bridge.
![]()
Abutments.
![]()
![]()
![]()