Uncredited photos on this page taken by: Nathan Holth. Unless stated in a caption, all photos are Copyright with All Rights Reserved. Learn about reuse of our photos.
Elevation from northeast quadrant.
East elevation.
Views beside bridge from northeast quadrant.
View of main span from sidewalk, northwest quadrant.
Views of main span from sidewalk, southwest quadrant.
Views beside bridge from southwest quadrant.
Elevated views from southwest quadrant.
Distant view.
Elevation of an approach span.
Views showing the newer approach system north of the bridge.
Views under the newer approach system north of the bridge.
Arch rib hanger connections as viewed from beside bridge.
Tie truss and hanger connections on the tie as viewed from beside bridge.
Arch rib hanger connections as viewed from bridge sidewalk.
Tie truss top chord and hanger connections on the tie as viewed bridge sidewalk.
Looking down at a bottom chord connection for the tie truss.
Details of hanger connection to tie.
Details at end of main span.
View on bridge sidewalk looking at the approach spans north of the bridge.
View on bridge sidewalk looking at the approach spans south of the bridge.
Bearings for approach spans.
Tie truss vertical members.
Tie truss diagonal members.
View of the flooring system for the upper deck.
Approach spans south of main span.
Overhead bracing.
Back |
Home |
Top |