Uncredited photos on this page taken by: Nathan Holth and Rick McOmber. Unless stated in a caption, all photos are Copyright with All Rights Reserved. Learn about reuse of our photos.
Plaque.
Bethlehem brand.
Views under bridge.
Top chord connections as viewed from beside bridge.
Top chord connections as viewed from on bridge.
Bottom chord connections as viewed from beside bridge.
Deck stringers and lateral bracing.
Bearings.
Lateral bracing connection under bridge.
Sidewalk cantilever.
Concrete pier.
West abutment, consisting of concrete and stone.
Concrete railing at west end of bridge.
Concrete railing at east end of bridge.
Vehicular railing.
Sidewalk railing.
Concrete curb.
Vertical members.
Diagonal members.
End post.
Bolted repairs at base of members.
Bearing and detail and base of endpost.
Portal bracing.
Expansion joint.
Bottom chord.
Interpretive sign about surrounding area.
Survey marker for replacement project, labeled pedestrian bridge. It may relate to the initial idea to leave the bridge standing next to its replacement for pedestrian use.
End post measurements.
Member measurements.
Back |
Home |
Top |