Uncredited photos on this page taken by: Nathan Holth and Luke Gordon. Unless stated in a caption, all photos are Copyright with All Rights Reserved. Learn about reuse of our photos.
![]()
Original / Full Size
Bridge being lifted off its substructure.
![]()
Original / Full Size
Bridge on land ready for disassembly.
![]()
Original / Full Size
Caissons after truss removal.
![]()
Bridge with deck partially removed.
![]()
Placing the spreader bar.
![]()
Bearing showing the bridge being cut free and the initial lift off the caissons.
![]()
Initial lifting of the bridge.
![]()
The crane crawls back pulling the bridge away from the river.
![]()
The bridge is moved off of the river.
![]()
The bridge is set down.
![]()
Bridge on land ready for disassembly.
![]()
Caissons after truss removal.
![]()
Caisson demolition.
![]()
Overview after bridge was dismantled and sorted into parts.
![]()
Vertical members.
![]()
Eyebars.
![]()
Sway bracing.
![]()
Top chord and end post sections.
![]()
Portal bracing.
![]()
Floor beams.
![]()
Bridge shoes.
![]()
Lateral bracing.
![]()
Details at end of member sections showing section loss.
![]()
Replacement bridge construction.
![]()
Marker tags for bridge parts.
![]()
Overview of bridge in temporary storage at St. Clair County Road Commission.
![]()
Bridge, before and after replacement: View beside bridge from northwest quadrant.
![]()
Bridge, before and after replacement: Portal view facing west.
![]()
Bridge, before and after replacement: Distant views facing east.
![]()
Bridge, before and after replacement: Views facing east.
![]()
![]()
| Back |
| Home |
| Top |
![]()



































































































