HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Historic Bridges: Holdcroft Construction Company of Kingston, Ontario

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.


Results in this list will be limited to the first 200 results. Consider performing a more narrow search from the main BridgeSeek tool if your search here is showing 200 results.

Total Bridges Found: 2

Click to visit page.
Bridge Street Over Moira River in Belleville: Hastings County, Ontario, Canada
Concrete Rainbow Through Arch, Fixed
Length: 220 ft. Main Span: 113 ft. Main Spans: 2
Built 1930 By: Holdcroft Construction Company of Kingston, Ontario and A. B. Crealock
Click to visit page.
Front Street Over Moira River in Belleville: Hastings County, Ontario, Canada
Concrete Rainbow Through Arch, Fixed
Length: 212 ft. Main Span: 108 ft. Main Spans: 2
Built 1930 By: Holdcroft Construction Company of Kingston, Ontario and A. B. Crealock

Divider

Back
Home
Top

Divider

About - Contact

Divider